Skip to content
McDek Nigeria Limited
Building the Nation one step at a time
McDek Nigeria LimitedMcDek Nigeria Limited
  • Home
  • About Us
    • Our Projects
    • Careers
  • Our Team
    • Mr. Onakoya Samuel O
    • Mr Odekunle O
    • Mr Oniyinde Daniel
    • Mr Adesanya Sola
    • Mr Adebayo Olakunle
    • Mr Olajide Ogunleye
  • Our Services
    • HVAC Systems and Control
    • High and Medium Voltage Substation and Distribution
    • Sewage and Water System Plant Control
    • Engineering Shop Drawing Development
    • Switching Devices
    • Low Voltage Distribution
    • Street Lighting installations
    • Fire Fighting and Protection System
    • Swimming Pool and Water Feature
    • Lighting Systems
  • Contact
  • Our Blog
  • Home
  • About Us
    • Our Projects
    • Careers
  • Our Team
    • Mr. Onakoya Samuel O
    • Mr Odekunle O
    • Mr Oniyinde Daniel
    • Mr Adesanya Sola
    • Mr Adebayo Olakunle
    • Mr Olajide Ogunleye
  • Our Services
    • HVAC Systems and Control
    • High and Medium Voltage Substation and Distribution
    • Sewage and Water System Plant Control
    • Engineering Shop Drawing Development
    • Switching Devices
    • Low Voltage Distribution
    • Street Lighting installations
    • Fire Fighting and Protection System
    • Swimming Pool and Water Feature
    • Lighting Systems
  • Contact
  • Our Blog
You are here:
  1. Home
  2. Project
ZoomDetails

Claridge School Progress

All projectsBy MCDEK Nigeria LimitedSeptember 16, 2020
ZoomDetails

Magodo project

All projectsBy MCDEK Nigeria LimitedSeptember 16, 2020

Magodo project block A. Magodo project block B .  

ZoomDetails

Adebutu Kessington Ofice Development at Iperu.Plumbing and Fire Fighting Installation

All projectsBy MCDEK Nigeria LimitedAugust 15, 2019

Adebutu Kessington Ofice Development at Iperu.Plumbing and Fire Fighting Installation

ZoomDetails

Grundfos Hydro Multi-S Pumps installation at Oba Elegusi ikoyi Lagos.

All projectsBy MCDEK Nigeria LimitedAugust 15, 2019
ZoomDetails

Typical outdoor unit and refrigerants pipe work connection installations

All projectsBy MCDEK Nigeria LimitedAugust 15, 2019
ZoomDetails

Marlboro Hotel, Lekki Phase 1 HVAC, Plumbing Electrical and ELV Installations (On Going)

All projectsBy MCDEK Nigeria LimitedAugust 15, 2019
ZoomDetails

Gtb Branch and Training School, Abeokuta Plumbing and AC Installations (On Going)

All projectsBy MCDEK Nigeria LimitedAugust 15, 2019
ZoomDetails

Residential Development at Oba Elegusu Ikoyi Electrical, Plumbing and HVAC

All projectsBy MCDEK Nigeria LimitedJuly 3, 2019
ZoomDetails

Fresh fields Properties HVAC’S Duct Work and Ventilation installations

All projectsBy MCDEK Nigeria LimitedJune 7, 2019
ZoomDetails

Mixed Development Building at Banana Island

All projectsBy MCDEK Nigeria LimitedJune 7, 2019
123

All Rights Reserved © Mc-Dek Nigeria Limited 2022

Go to Top
Enquiry
close slider
[fc id='2'][/fc]